MEP coordination method is used for developing 3D coordination models where all Mechanical (HVAC), Electrical and Plumbing components are integrated effectively. This method assists in reducing conflicts among these MEP components. MEP coordination is considered as one of the most vital processes in construction that should be given special attention as it ensures that the building’s architectural design and the structural framework doesn’t interfere with its Mechanical, Electrical, Plumbing, and Fire Protection systems. Thus, it has become one of the most integral practices in the AEC industry. MEP coordination process varies from one firm to another depending on the client’s requirements and the Level of Detail (LOD) sought. Evaluation of Consultant Design Drawings and Structural/Architectural Plans In the initial step, the MEP coordination service providing organization gets single -line drawings from the MEP-contractors or consultants. Later, they analyze the structural...